The Wrecking Crew's 15 Minutes Are HERE!


Yup, this is it. Our fifteen minutes have come. And we're pretty damn happy about how it all worked out. This morning a segment aired on NBC's TODAY Show that featured Humphrey House and the regulars of the Wrecking Crew doing what we do best: some serious demolition.

A few weeks ago (just after part one of the kitchen demo) we were contacted by producers at NBC's TODAY show, who were looking to film a segment on renovation parties. We were wary after the 'Three Martini Renovation" article, but several emails and phone conversations later, we started to get excited.

The day the crew arrived to shoot we had planned for about 10 people to come over. Sara got the flu, Brian got a job, and so it ended up being Jason and I, plus Kenny (daddoo), Scott, Julie, Mark and Amy. We ended up doing about 90% of the demo work for the kitchen, including removing the cabinets, the wall, the appliances and most of the interior walls. Jenna Wolfe, the correspondent for the piece, was lethal with the sledgehammer - she had some serious power going on. [I have to wonder, Jenna, could you lift your arms the next day?] I worried a bit about the two-person video crew as we were taking out the wall with them on the other side, but they never complained. And then once it was dinner time - we really did work all day - we used the last remaining light to chill in the back with Jay and Scott on guitar (sara, we missed you!) and Mark on the grill. All in all, a pretty good demo day.

Both Jenna and her producer Meredith were very cool to work with for the day, and we couldn't be more pleased with the piece that they put together. They kept the focus where it really belongs: on the fact we couldn't do this without the support and hard work from our friends and family.

Wednesday, October 10, 2007

Kitchen Demolition Party, part 1

Jay, Julie and Scott - The Wrecking Crew
Last weekend we sent out the call for a demolition party and started to tear into our kitchen renovation by beginning to combine the space with the small bedroom that was next to it. Because we first went to Jim Gill's house for the Illinois Solar Tour, and we then had to set up a temporary kitchen/pantry in another room of the house, we actually didn't start tearing into the lathe and plaster until late afternoon.

Our Wrecking Crew was rounded out when Scott and Julie showed up armed with humidity controlling masks and OSHA-approved Chicago Bears hard hats. And much to the WSJ's chagrin, we followed our usual procedures of holding off on alcohol until after the work was done. Unfortunately, later in the night neither of these prevented Jen from accidentally getting knocked in the head with the handle of a sledgehammer - she didn't have her hard hat on! Luckily she was ok, but next time she'll definitely be wearing the hats!


Julie and Jen tear into the wall
Julie and Jen tear into the dividing wall.

We ended up doing a lot of work - tearing down all the walls in the "other kitchen" room. And there were a few interesting surprises, too. On the exterior walls, we discovered that Mark and I did a good job blowing cellulose insulation down our walls because there were no gaps or spaces in the loose stuff. Best of all, we weren't itchy! But Scott won the prize for best discovery this time, as he uncovered an old leather shoe in the wall, which looked to be a vintage woman's dress shoe!

Next up is to finish moving out the old kitchen itself, so we can tear down the other half of the wall.

Monday, September 17, 2007

Installing a Loopy Rain Barrel

The city of Chicago offered a rain barrel initiative this year so people could purchase these at a discount. The city benefits because, during a period of heavy rains like we had in August, less water goes into the storm sewers, reducing the chance of basements flooding. Personally, I just like the idea of using natural water for our garden plants rather than treated chlorinated water.

Jen is cool with almost any idea that helps keep her plants green. Normally, a rain barrel is installed directly beneath a downspout. The problem is, none of our downspouts are near our backyard plants. When I mentioned this idea to my friend Mark, he said he had just watched a TOH episode where they not only installed a rain barrel, but did so with a neat backflow diverter kit. Once the barrel is full of water, this sends the excess water back down to the gutter. That sounded perfect for our situation, so I picked one up when Jen and I checked out a green building supply house in Chicago.


So last weekend, with the supplies in hand, Mark and I set to modifying our gutter system to install this two-part system. Our setup was a bit more challenging as the gutters were much larger than what the diverter was designed for, but we finally decided to create a loop branch off one of the main downspouts.

As shown here, most water continues uninterrupted through the downspout, but some water is caught by a flap and brought IN to the rain barrel loop. Once the barrel is full, the water level will feedback and rise to the diverter, and excess water will flow through the OUT branch of the loop.

Since this downspout was about 12 feet from the rain barrel's desired location in our backyard, we couldn't install the supplied hose that came with the kit, and had to adapt a longer garden hose shown in the photos above. I think I may need a can of spray paint to make the white diverter brown, but other than that, the system is complete.

After a quick hose test, the barrel started to collect some water, so all we need is a nice downpour to see how quickly the barrel fills up!

Thursday, August 30, 2007

Back on the chain gang ...



After several months of (well-deserved) hiatus, we're starting to get ready to focus once again on Humphrey House. We had a gathering over Labor Day weekend, and it turns out some of our friends are itching to get back in the rehabbing action as well. After some lobbying by Mark, he and Jason are set to tackle the failed gutter system this weekend (I'm lobbying for bungee cords attached to their waists) as well as properly installing the rain barrel. My friend Michelle, who recently relocated to Chicago from downstate, volunteered to do some trim painting so we can cross it off our punch list, and her new boyfriend Kevin is a CARPENTER ... he offered up his skills for future projects as well. And since the next main project we're tackling is the kitchen, we're going to be scheduling another Wallbangers Ball probably close to the end of the month or the start of October to remove the wall separating the kitchen and bedroom and join the two spaces into one. We'll have to do some investigating as to how that should happen since it's a supporting wall and will have to be replaced by a header, but at least we know we've got volunteers! As Sara said, "Who the eff doesn't like to smash things once in a while?" :)

Sunday, March 18, 2007

Ode to Sconces (& Mark)

How do I love thee? Let me count the ways.

I love thee to the depth and breadth and height
Your 20 watt bulbs can reach, and then some.
I love thee with a love I seemed to lose
With my lost contractor-I love thee with the breath, smiles, tears, of all my life!-and, if God choose,I shall but love thee better with every lightbulb change.
I love you not only for what you are, but for what I am when I am with you.
(Apologies to Elizabeth Barret Browning )
And to Mark, for making it happen, bringing the magic, using quarters in a way punishable by law ... many, many beers.

Thursday, December 14, 2006

Stud-ly help before the drywall comes

Monday morning, we had our drywalling contractors come to begin finishing our attic. The only problem was, we weren't ready for them yet. There was still the shower to frame, closets to build, and several other punchlist items to take care of. I knew it would be a long hard weekend.

Shower PanSaturday began early with John showing up at 8:30 to reroute the plumbing vent for the shower drain (which was finished before the wall was built, and was inside the shower area). He also brought some thick 40 mil liner that we lined the bottom of the shower with to create our custom shower pan. This liner will be the last line of defense for the ceiling below in case any water gets underneath the tile that will be the base of the shower. Due to the zoning setback requirements, our bathroom addition got squeezed a bit, and it will likely be most noticeable in the shower, which will be 30" wide. Hopefully making it 42" long will help compensate for the narrow width. It will be tight, but I think we can make it work. While John was here, we also ran a 1/2" copper line from the basement to the bottom of the shower area. This will be for the steam generator we purchased that will give us a much-needed retreat after a hard day's work! I can't wait for to try that out.

Saturday bonus: Our tub came in earlier than expected so we received it with the drywall delivery on Saturday, so while John was here we moved the tub up and mounted it (screwed) into place. We didn't have all the parts to hook up the drain yet, so there's still some work left, but at least we know what we have (and what we need) now!

Shower with plastic vapor barrier, from the outsideSunday was the big day that was our deadline. There was two day's worth of work to do in one day, so I did the only thing possible to help: I hit the Easy Button and Scott and Julie came over to help us wrap things up. They began by wrapping the interior shower ceiling and walls in plastic sheeting that will keep moisture from the steam getting to the wood underneath. We also carved out a niche for shampoo bottles, ran some speaker wire, put interior glass block windows to brighten the rooms, and Julie got to play stud-finder and marked stud locations on the floors for future reference. Of course, we had to clean everything up and move everything out so the drywallers had room to move.

But we did it. We wrapped everything up by 8:00 and we were ready for the drywallers to come on Monday.

And then at 10:30 sunday night, after looking over everything one last time, Jen asked, "So, how do we turn the steam shower on and off?"
"There's a separate control," I replied.
"Oh ok. Where is it?"
"It will be on this wall of the shower, and goes on after the tile is installed. Then you just connect it to the control cable right here... Oh wait a minute. The cable isn't there! Ahhh..." I screamed, realizing I had to run the cable really quickly.

So, we were finally ready just before midnight. But hey, we still met the Monday deadline!

Tuesday, July 18, 2006

A skeleton in the attic

Gramma's ghost has given way to a skeleton, as sidewalls, knee walls, and ceilings emerge upstairs.
I think this is one of my favorite parts of the whole construction process. For the first time, you start to see how the plans and designs you drew up (years ago) physically take shape. No more 1/4" = 1 foot scale; this is the real thing. Three dimensions, baby!

And it allows you to come up with other ideas. Such as pocket doors to allow more space (and light) into what will be a somewhat narrow laundry room. Or laying out and framing openings for future built-ins, such as two dresser drawers in what will be the master bedroom.

Many of the interior walls are being constructed by our contractor, but Kenny and Brian came up to lose weight during Chicago's massive heat wave last weekend by working in our attic with Jay. Actually, Brian raised the ceiling framing in the master bedroom, and Kenny helped construct the knee walls and insulate the under-eave areas.

Getting the materials upstairs proved to be fun as Mark briefly stopped by at the perfect time to help Ken and Brian toss boards up through the window. This assembly line was so much easier than carrying things through the kitchen and up the stairs. Wish Mark had thought of this sooner! ;-)

Anyway, thanks to Brian and Kenny's help, we got through the long weekend, and we are nearly complete with the framing for upstairs. We're planning on having the electrician come next weekend, and it all needs to be in place by then.

Tuesday, May 02, 2006

Starting off on the wrong (left) foot

While awaiting estimates from contractors to frame our dormer, we've begun to take advantage of the still-cool weather to work with the unpleasant work of demolition. Actually, this was planned for a couple of weeks, but we first had to relocate many of the things being stored in our attic. I forgot how much stuff we had up there, so we didn't really get started until this past weekend.

Where would we be without Scott and Julie? They came over Saturday afternoon to lend a hand... and ended up contributing a foot! A foot, you say? Yes indeed, a foot. And a leg too!

Let me explain. Shortly after their arrival, Jen and Julie went to pick up some supplies, while Scott and I removed the carpeting stored up there. After about 5 minutes, we were almost done with this task. On the final trip, we walked across the floor, and suddenly I heard a bursting crash behind me. When I turned around, Scott was about 36 inches shorter, as his left foot had found one of the spaces without any subflooring, and gone straight through our dining room ceiling!

Fortunately the poor guy managed to come up unscathed, which is no small feat. Also fortunate was that this did not happen 10 minutes earlier, when Julie was sitting in the dining room closely under the soon-to-be extra skylight.

We actually covered the whole with an extra piece of drywall and cleaned up before they returned from the store. I know, i know. I should have taken a photo earlier. Oh well - maybe we can recreate it.

Honestly, I figured that sooner or later, someone (most likely me) was going to poke a hole in the ceiling since we have to redo the entire floor up there, so it's probably a good thing we popped the cherry and got it out of the way. Poor Scott felt pretty badly about the whole thing though.

I think he worked extra hard once we got past the unintended demolition and started working on parts of the second floor we actually planned to demo. :)

We managed to get a fair amount accomplished once we covered the floor upstairs :) What will be the master bedroom is completely gutted to the point we need it, except for the floors. Julie even ripped into the wall with a sawzall to make room for some built-in storage! So by the end of the day, we not only increased the ventilation between the first and second floors, but also got some things done!

Wednesday, July 06, 2005

Today's deadline

We worked like mad the last five days... spending Independance Day weekend putting the finishing touches on our place in preparation for the building inpection today (Wednesday). Of course we had great help as usual from our family - Jen's dad Ken, Scott, and Jay's grandpa all came by to help us get things finalized.

Now everything will go under the magnifying glass as Jen leads the inspectors through our basement to check out the HVAC, framing, and electrical roughing. Keep your fingers crossed until 1:30... Will we clear this hurdle?